Howard County Secures $75M Loan For 5,000-Foot Tunnel To Divert Floodwater From Ellicott City

podcast: CBS Baltimore

Once completed, the tunnel will carry 26,000 gallons of stormwater per second away from the town's streets and into the Patapsco River.
Publicado con Parlarispa

Lista de episodios - [audio]